Reykjavík · Keflavík · Selfoss +354 769 6246[email protected]

Plastering and repairs

We get walls ready for paint, from plasterboard joints to renovating old walls.

A plastered wall
from3.500kr / m²excl. VAT

Good paintwork starts with a good wall. We plaster whole surfaces or just the plasterboard joints, and we repair cracks and uneven patches.

Old walls get scraped, filled and levelled.

What we do

  • Plastering walls and ceilings
  • Plasterboard joints: mesh tape and two coats of compound
  • Repairing cracks
  • Levelling uneven walls
  • Renovating old walls

How we work

How plastering goes

  1. Step 1

    Assessing the wall

    We check how flat it is and where it cracks.

  2. Step 2

    Repairs

    We scrape off old layers and fill cracks.

  3. Step 3

    Plastering

    We apply the compound and level the surface.

  4. Step 4

    Handover

    We check the finish with you.

A plastered wall

Pricing

Plastering and repair rates

Enter the area for each job you need. The cost of every line and the total appear straight away.

WorkRate (excl. VAT)AreaCost

Plastering

3.500–5.000kr / m²
—

Plasterboard joints

mesh tape and two coats of compound

4.000kr / m
—

Renovating old walls

scraping, filling cracks, levelling and other work

from 5.000kr / m²
—

Prices are for labour only, without materials. The result is an estimate, and the final quote depends on the area, the condition of the surface and the scope of work.

Common questions

Plastering and repair questions

How is plastering a whole wall different from plasterboard joints?

For joints we work only on the seams between boards. We embed mesh tape and apply two coats of compound (4.000 kr/m). Plastering a whole surface is a separate line in the price list.

What decides the price of plastering?

The state of the walls and how much needs doing. That is why the price list gives a range of 3.500–5.000 kr/m².

When do old walls need renovating?

When they are cracked, uneven or need scraping. Prices then start at 5.000 kr/m².

Can I paint straight after plastering?

Not quite. The compound has to dry first. We agree when painting can begin as the work goes on.

Can you plaster and paint in one job?

Yes. We can put both in a single offer.

Tell us about your job

Give us the type of work, the town, the rough area and when you would like to start.

Tell us about your job
Call